MÉXICO – TOLUCA INTERURBAN TRAIN

CLIENT:
Secretariat of Infrastructure, Communications and Transportation (SICT)

CONTRACT AMOUNT:
7,700 Million MXN

DESCRIPTION:
Supply, installation, testing, and commissioning of track, catenary, and power systems with the following specifications:

Execution of 57.7 km of double track.

53 km of double-track flexible catenary (type STI-V200) and 10 km of rigid catenary inside the tunnel.

Execution of 2 Traction Substations (40MVA), with high-voltage (230 kV) and medium-voltage (23 kV) grid connections.

Execution of 17 lighting and power substations at 23 kV.

23 kV Medium-Voltage Loop.

Execution of 50 line equipment units.

Power control, protection, and telecontrol systems.