Projects
We create infrastructure that transforms

Rail Sector
Mexico-Querétaro Passenger Train

Energy Sector
NUEVO LAREDO SUBSTATION

Rail Sector
MÉXICO – TOLUCA INTERURBAN TRAIN

Energy Sector
AIFA – LECHERÍA SUBURBAN TRAIN

Rail Sector
CATENARY SECTION 5 SOUTH – SUBSECTION C

Rail Sector
MAYA TRAIN SECTION 6 CATENARY

Rail Sector
MAYA TRAIN SECTIONS 5N AND 6 REMOTE CONTROL

Energy Sector
CFE I20 PHASE 1 PROJECT

Energy Sector
CFE PROJECT I20 PHASE 2 STAGE 3

Rail Sector
SECTION 5 NORTH CATENARY – MAYA TRAIN

Rail Sector
SUPPLY OF CABLES AND INSULATORS

Energy Sector
CUCHILLO SUBSTATION BANK 2

Energy Sector
LA MESA AND CD. VICTORIA WIND FARMS

Energy Sector
AURA II PHOTOVOLTAIC PLANT IN HONDURAS

Energy Sector
RELOCATION OF TRANSMISSION LINES

Energy Sector
TRANSMISSION AND TRANSFORMATION

Infrastructure Sector
PURGATORIO DAM

Infrastructure Sector
PEROTE – XALAPA HIGHWAY (60 Km)

Infrastructure Sector
SALTILLO – MONTERREY HIGHWAY (95.6 Km)

Infrastructure Sector





