CLIENT:
Secretariat of National Defense (SEDENA)
CONTRACT AMOUNT:
150.7 Million pesos
DESCRIPTION:
Installation of the catenary system for Front 4 of Section 5 North of the Maya Train, including:
Installation of aerial return cable and cable down-drops every 450 m.
Installation of contact wire and messenger wire.
Installation of negative feeder, droppers, and connections.
Installation of insulators and miscellaneous equipment.






