SECTION 5 NORTH CATENARY – MAYA TRAIN

CLIENT:
Secretariat of National Defense (SEDENA)

CONTRACT AMOUNT:
150.7 Million pesos

DESCRIPTION:
Installation of the catenary system for Front 4 of Section 5 North of the Maya Train, including:

Installation of aerial return cable and cable down-drops every 450 m.

Installation of contact wire and messenger wire.

Installation of negative feeder, droppers, and connections.

Installation of insulators and miscellaneous equipment.