CLIENT:
CFE
CONTRACT AMOUNT:
302 Million pesos
DESCRIPTION:
Execution of all necessary works for the construction and installation of 3 transmission lines (TLs) at 230 kV and 115 kV with the following specifications:
Total length of 29.2 circuit kilometers (km-C) and 2 substations (SSs) at 230/115 kV, with a capacity of 133.3 MVA, 18 MVAr, and 5 feeders, located in the state of Chihuahua, Mexico.